Traffic Improvement on E20 and Construction of 2 Bridges
Major road infrastructure project improving traffic flow on E20 highway with the construction of two new bridges and associated improvements.
Project Overview
This project involved significant improvements to the E20 highway in Dubai, including the construction of two new bridges to replace at-grade intersections, improve traffic flow, and enhance safety.
Key Features
- Two new bridge structures
- Highway widening and realignment
- New traffic interchanges
- Improved drainage systems
- Enhanced signage and lighting
Technical Specifications
- Bridge 1: 180m span, 6 lanes
- Bridge 2: 140m span, 4 lanes
- Highway widening: 4km total length
- New lanes: 8 additional lanes
- Improvements: Drainage, lighting, signage, and barriers